• 0%
    0 votes
  • Rate this episode
    What did you think?

    Tips From A Shipwright: Season 1

    1x31 Inventing The Hardware

    • 2017-03-09T05:00:00Z on YouTube
    • 15m
    • United States
    We're back cranking on our TotalBoat skiff build, it's time to install the hardware needed to fasten and secure the spring lines once the boat is in the water. By substituting plastic through hull fittings for much more expensive Hawes pipe fittings, we've fashioned our own holes that allow us to run a line down through the top gunwale and tie off below. This keeps the coverboard free of any and all obstructive hardware. Using a hole saw and a little effort, we now have a much cleaner design for tying up our TotalBoat work skiff.
    Loading...