Two crawler cranes lift a 320-ton component of a railroad bridge into position on the ICE line between Nuremberg and Bamberg. This is no easy maneuver for project manager Michael Eck and his team, as the machines have to work in sync in a very confined space. Meanwhile, in the Ahr Valley, Tommy Zuther and Sebastian Röske are renovating the basement of a 15th century half-timbered house using clay bricks. The flood had completely devastated the listed building. And in Willingen, Germany's longest pedestrian suspension bridge is being built. (Text: DMAX)