The Inn Canal near Tögging is getting a new bridge. The lifting of the 160-ton steel colossus is a matter for the boss in the Upper Bavarian district of Altötting. Markus Helling and his team have to work with absolute concentration to ensure that the 60-meter-long structure is not damaged. And Bilal Özsoy and his colleagues have to install a lattice support under the roof of the listed Alster swimming pool. The "construction site heroes" improvise during transport with a 130-ton crane, a lifting platform and pure manpower. (Text: DMAX)